Altadena, CA · Unincorporated Foothill Community

Kitchen Remodeling in Altadena, CA

Whether your foothill house came through 2025 and just needs an update, or you are planning the kitchen of a home rebuilt after the Eaton Fire, we lay it out in 3D, price it line by line and take it through LA County permitting.

10Kitchen Services
200+Reviews
24 hrsResponse Time
CSLB#1087602 Licensed
Starting an Altadena Kitchen

Every Altadena Kitchen Starts Somewhere Different

Some Altadena kitchens are in older foothill houses that came through January 2025 untouched; before the fire, roughly nine in ten homes here were built before 1979. Others belong to families designing a new home after the Eaton Fire, which destroyed more than 9,400 structures. Many projects sit somewhere between the two.

The planning steps stay the same in every case. We measure the existing room or review the architect’s drawings, then settle cabinets, appliances and circuits in a 3D design before money goes into materials.

Request a Kitchen Remodeling Estimate

Share your Altadena address, remodel goals, and timeline. A kitchen remodeling specialist will follow up with next steps.

Getting the House Ready

Smoke Damage, Venting and a Protected House

A few things are worth sorting out before the old kitchen comes out or the new one is framed.

  • After smoke or minor damage. When a home survived but its finishes didn’t, we scope room by room what stays and what is replaced, starting with cabinets, counters and flooring.
  • Hood ducts in rebuilds. Fire-hardening rules govern the outside of a rebuilt home: roof, vents, siding, windows and eaves. A range-hood duct that passes through the roof or an exterior wall is detailed with your architect to match them, while the kitchen inside follows the normal codes.
  • Protecting what stays. In an occupied house, floors, doorways and the path to the yard are covered, and dust is kept out of the rest of the rooms.
Kitchen Services

Kitchen Services Across Altadena

From one new counter to a whole kitchen inside a rebuilt home, the same in-house team designs, builds and sees the work through County inspection.

CSLB licensed#1087602
Existing or rebuiltBoth welcome
LA County permitsFiled for you
Free estimateResponse in 24 hours

What Does Your Kitchen Need?

Choose a service to see how we handle it in Altadena and what it costs.

LA County Permits

Getting an Altadena Kitchen Permitted

Altadena is unincorporated, so a 91001 address answers to LA County, not the City of Pasadena. Permits come from LA County Public Works Building & Safety, with applications, plan check and inspection requests handled in EPIC-LA; zoning questions such as an addition go to the County’s Department of Regional Planning. This is how kitchen work commonly lines up, and we confirm your exact scope with the County.

WorkUsually needsWhat to know
Replacing cabinets, counters and finishes in placeOften finish work onlyWhen no wiring, plumbing or walls change, the scope is light. Plumbing or electrical permits can still apply once those are touched.
New lighting, circuits or an electrical panel upgradeElectrical permitNew circuits in an Altadena kitchen come under County electrical permitting.
Relocating the sink, gas range or water heater linePlumbing permitWe also bring in the right water company or SoCalGas when a service changes.
Opening or removing a wallBuilding permit with plan checkDrawings are submitted through EPIC-LA before work begins.
Kitchen in a fire-rebuilt homePart of the rebuild permitRebuild applications go through EPIC-LA or in person at the One-Stop Permit Center.
Additions or a second storyBuilding permit plus Regional PlanningCommunity standards limit single-family homes to two stories and 35 feet.
  • Fire-affected owners can get in-person help at the Altadena One-Stop Permit Center, 464 W. Woodbury Road, Suite 210.
  • The center takes walk-ins Monday to Friday, 8 a.m. to 4:30 p.m., with the last permit call at 3 p.m.
  • It also books rebuild consultations and SoCalGas and SCE planner appointments.
Service Details

Service by Service, for Altadena Homes

Here is how each part of the kitchen comes together, what changes in Altadena, and the usual price here.

Storage built to the room

Cabinet Installation in Altadena, CA

Plenty of foothill kitchens were built with a few deep base cabinets and hardly any drawers.

We swap those for drawer stacks, a pull-out pantry and wall cabinets that reach the ceiling, all sized to measured walls instead of catalog assumptions. Fillers are scribed to older plaster, and soft-close hardware comes standard.

For Altadena homes

In a rebuild, cabinet runs are drawn into the architect’s plan before framing, so outlets, windows and the hood duct land exactly where the boxes need them.

Our first checks
  • Measure walls or read the plans
  • Plan drawers before door style
  • Run wall cabinets to the ceiling
  • Scribe fillers to uneven plaster
Crisp white Shaker kitchen cabinets

What do installed cabinets cost in Altadena?

Cabinet installation in Altadena is usually priced at

$400–$800 per installed linear foot.

Inset or custom doors, wood species and interior pull-outs push toward the upper end.

One long prep surface

Countertop Installation in Altadena, CA

A good counter runs without a break from the sink to the cooktop.

Quartz and granite are templated once the cabinets are fixed, with joints placed where they disappear and an overhang sized for any stools. We bring slabs or samples for a side-by-side choice.

For Altadena homes

Craftsman and Spanish Revival houses often look best with honed or softly veined stone, while newer rebuilds lean to clean white or gray quartz.

Our first checks
  • Template after cabinets are fixed
  • Place joints out of sight
  • Size overhangs for seating
  • Choose the sink before cutting
Quartz kitchen countertop installation

How are Altadena countertops priced?

Installed quartz and granite in Altadena generally cost

$60–$130 per square foot.

Premium slabs, mitered edges and extra cut-outs raise the per-foot cost.

Tile with character

Backsplash Installation in Altadena, CA

The backsplash is where an Altadena kitchen can show the house’s personality.

Handmade and zellige-style tile suit the town’s Craftsman and Spanish Revival homes, and a simple slab splash works in a cleaner-lined rebuild. We set tile on a sound backer, plan the pattern around outlets and seal the joints.

For Altadena homes

In older plaster walls we check for loose patches before tiling, and in a rebuild the backsplash height is set while outlets are still being placed.

Our first checks
  • Pick tile style to suit the house
  • Check old plaster before tiling
  • Set outlet positions with the pattern
  • Choose grout and sealer
Warm traditional kitchen

What does backsplash tile cost in Altadena?

Installed backsplash tile in Altadena typically falls between

$14–$48 per square foot.

Machine-made ceramic is the most economical; handmade or zellige tile and slab splashes cost more.

Floors that connect the rooms

Kitchen Flooring in Altadena, CA

Old fir or oak often continues from the dining room straight into the kitchen.

Matching it, or deliberately not matching it, is a decision we make with you early. New kitchen floors go over a checked, level base with transitions planned into each doorway.

For Altadena homes

Porcelain and ceramic tile are the usual kitchen choice here. In an older raised-floor house, we look for water damage near the sink before the new floor goes in.

Our first checks
  • Decide whether to match old wood
  • Check the base near the sink
  • Level before installation
  • Plan each doorway transition
Kitchen flooring with room transitions

How much is new kitchen flooring in Altadena?

Porcelain or ceramic tile flooring in Altadena generally runs

$8–$12 per square foot.

Repairs to the subfloor, removing old layers and patterned layouts add to the cost.

Light under the trees

Kitchen Lighting in Altadena, CA

Tall foothill trees can leave a kitchen dim even at noon.

Layered lighting solves it: recessed cans for the room, under-cabinet strips for the counters and a pendant over the island, each on its own control. Fixtures are efficient LEDs chosen to suit the house.

For Altadena homes

Many older foothill kitchens rely on one ceiling fixture and a window facing the trees. Under-cabinet task light usually makes the biggest difference, and new circuits are added under County electrical permitting.

Our first checks
  • Plan room, task and accent light
  • Check the panel in older homes
  • Give each layer its own control
  • Wire before walls are closed
Kitchen pendant and recessed lighting remodel

What does kitchen lighting cost in Altadena?

Electrical labor for a typical Altadena lighting package runs

$860–$3,350 per kitchen, fixtures not included.

Attic access, the number of lights and any new circuits decide where your project lands.

Coordinated with every utility

Appliance Installation in Altadena, CA

A new range, fridge or water heater can involve three different utilities in Altadena.

We confirm opening sizes, door swings, the gas or electrical supply and the hood route before you buy, then set, connect and test each appliance on install day.

For Altadena homes

Your water provider depends on the street: Lincoln Avenue Water Company in the northwest, Rubio Cañon Land & Water Association in the east, and Las Flores, Kinneloa or Pasadena Water & Power elsewhere. Gas is SoCalGas and power is SCE.

Our first checks
  • Confirm each appliance opening
  • Identify your water company
  • Check gas and electrical supply
  • Route the hood duct outside
Kitchen appliance installation

How much does appliance installation cost in Altadena?

Installation labor for a kitchen’s appliances in Altadena is roughly

$480–$2,400 per kitchen.

Panel-ready units, new gas lines and exterior hood ducts add labor; appliances are purchased separately.

Planned in, not squeezed in

Kitchen Island or Peninsula in Altadena, CA

In a rebuild, an island can be part of the plan from day one.

Plumbing and power can then run under the slab or floor exactly where the island needs them. In an existing house we measure the aisles first and suggest a peninsula when the room is tight.

For Altadena homes

Older Altadena houses often have kitchens that open onto a family room or porch, so we keep circulation to those doors clear before choosing island size.

Our first checks
  • Measure aisles or mark the plan
  • Keep doors to the yard clear
  • Choose sink, seating or storage
  • Run utilities before flooring
Butcher block kitchen island prep surface

What does a kitchen island cost in Altadena?

Expect an Altadena island to cost

$4,300–$17,500 depending on size and utilities.

A simple prep island sits low; a sink, seating and custom cabinetry raise it.

Compact and well planned

Small Kitchen Remodeling in Altadena, CA

Cottages and older bungalows can have compact kitchens with awkward door placements.

Smart appliance sizing, narrow pull-outs and a clear work triangle do more here than removing walls. We draw the room to scale so every door and drawer opens without a clash.

For Altadena homes

In many older Altadena cottages the back door and a hallway both open into the kitchen, so we plan storage around those paths rather than against them.

Our first checks
  • Map doors and walkways first
  • Size appliances to the room
  • Add narrow pull-outs
  • Keep the work triangle tight
Contemporary white kitchen

How much does a small kitchen remodel cost in Altadena?

Small kitchen projects in Altadena usually cost

$26,238–$34,493 in total.

Relocating plumbing or choosing inset cabinetry raises the figure.

Layout Planning

Layout and Design for Foothill Houses

Moving the sink to the window or opening the kitchen to a family room is often the change people remember most. The house itself usually suggests the style.

  • Craftsman bungalows: quarter-sawn oak or painted inset doors with simple bronze hardware feel natural.
  • Spanish Colonial Revival homes: color in tile and soft arches suit these kitchens well.
  • Mid-century ranch houses: flat or slim-frame doors and long, uninterrupted counters fit the low lines.
  • Rebuilt homes: many owners choose warm modern design that nods to the neighborhood without copying it.
  • Historic streets: Christmas Tree Lane, the stretch of Santa Rosa Avenue lined with deodars planted in 1885, is on the National Register, and nearby houses often reward a traditional approach.
Cost Guide

Altadena Kitchen Remodel Costs

A full Altadena remodel with a new layout typically falls between $89,000–$167,500. Your estimate is written after we measure or review your drawings.

What does a full kitchen remodel cost in Altadena?

For a remodel that changes the layout and replaces cabinets, counters, flooring, lighting and appliances, budget about $89,000–$167,500. In an older house, the panel, gas piping and drains are checked first, and any upgrade is priced into that number rather than added later.

Full remodel, new layout$89,000–$167,500Installed project total

Typical Altadena price bands

Ordered from the smallest scope to the largest:

Light refresh

New counters, backsplash, lighting or fronts in the existing layout.

$26,000–$47,000
Small kitchen

A compact kitchen rebuilt completely. It starts just above a refresh because nothing original stays, but the small room keeps the top lower.

$26,238–$34,493
Mid-scope remodel

New cabinets and surfaces in a standard-size kitchen.

$47,000–$89,000
New layout

Plumbing, gas and walls moved, usually with new everything.

$89,000–$167,500
Custom or structural

Custom cabinetry, premium appliances or structural changes.

$157,000–$261,500

The service prices above are not meant to be totaled. In a full remodel, demolition, rough-in and management are shared across trades, so the combined price is lower than the separate jobs added together.

For a fire rebuild, we can price the kitchen as its own line inside the whole-house budget, so you compare cabinet and appliance options while the house plans are still flexible.

Process

Our Process for Altadena Kitchens

Step 1

Parcel and site check

We confirm the County path, your water provider and the condition of the house or plans.

Step 2

3D kitchen design

The layout is drawn with real cabinet and appliance sizes, then finishes are chosen.

Step 3

Estimate and County filing

An itemized estimate, then drawings filed with LA County when the scope needs a permit.

Step 4

Construction

Our crew sequences demolition or framing coordination, rough-in, cabinets, stone, tile and lighting.

Step 5

County inspections

Inspections are requested and passed, the punch list is closed and the kitchen is handed over.

Service Area

Serving Altadena and the Foothill Communities

We work on both sides of Lake Avenue, from the streets near the Pasadena line up to the foothills, in existing houses and on rebuild sites alike.

Neighboring areas we serve:

Project Gallery

Kitchen Ideas From Our Project Gallery

Reviews

What Homeowners Say About Our Kitchen Team

200+ reviews from homeowners across Los Angeles County.

★★★★★

"They measured carefully, showed a 3D layout, and did not push an island our aisle could not support. Cabinets and quartz look sharp, and the job site stayed clean."

Maria G., Los Angeles, CA
★★★★★

"Storage was the problem, tall pantry and drawer bases fixed it. Lighting under the cabinets made the counters actually usable at night."

Daniel & Rosa L., Los Angeles, CA
★★★★★

"Permits and inspections were handled without us chasing paperwork. One team for cabinets, counters, and appliances."

Hector P., Huntington Park, CA
★★★★★

"Peninsula instead of a forced island, exactly what our floor plan needed. Soft-close everywhere and a clear itemized quote."

Ana R., Cudahy, CA
★★★★★

"They coordinated the range hood vent correctly and explained electrical upgrades before work started. Professional from consult to walkthrough."

Luis M., Bell, CA
★★★★★

"Transparent pricing and a project manager who answered texts. The finished Shaker kitchen feels like our house, just updated."

Patricia S., Commerce, CA
FAQs

Altadena Kitchen Remodeling FAQ

How much does an Altadena kitchen remodel cost? +

A light refresh starts at about $26,000, a mid-scope remodel is $47,000–$89,000, and a full remodel with a new layout usually lands at $89,000–$167,500.

We are rebuilding after the Eaton Fire. When should the kitchen contractor get involved? +

As early as your architect allows. Kitchen decisions made before framing cost nothing to change on paper and a lot to change on site.

Can you work from my architect's drawings instead of your own design? +

Yes. We price and build from your architect's kitchen plan, or develop the kitchen design within it if the drawings leave it open.

Can I stay in my house during the remodel? +

Usually. We seal off the work area, keep a path to the outside clear and can set up a temporary sink and microwave corner.

What does a first visit cost? +

Nothing. The estimate is free, and we respond within 24 hours to set it up.

Start Planning Your Altadena Kitchen

Updating, repairing or rebuilding, tell us where your Altadena project stands. Call (213) 515-6576 or use the form; we answer within 24 hours, Mon–Sat 7AM–5PM.

  • Free estimate, with a 3D design before work or framing
  • CSLB #1087602 and our own in-house crew
  • LA County permits and utility coordination handled

Request Your Consultation

Share your goals and timeline. A kitchen remodeling specialist will follow up.