South Whittier, CA · 1950s tract homes

Kitchen Remodeling in South Whittier, CA

South Whittier's 1950s tracts have kitchens built for another era. We bring them up to date and permit through LA County.

10Kitchen Services
200+Reviews
24 hrsResponse Time
CSLB#1087602 Licensed
Know the House First

Start With the House You Live In

Before the tracts, the land south of Telegraph Road was ranch and oil country. According to local historians, Marius Meyer raised sheep across much of it, his family and the Mayberrys let oil companies drill on their land between 1910 and 1930, and a Sunshine Farms Market stood on Telegraph in the 1930s. The County's planners still call part of the area Sunshine Acres. After the war, land companies subdivided the ranches around roads like Meyer and Carmenita, and the census first counted South Whittier as a place in 1970.

The housing shows how fast that happened. Nearly half of the community's roughly 15,700 homes were built in the 1950s, and more than six in ten before 1960. About three-quarters are detached single-family houses, and nearly two-thirds of households own. For a kitchen remodel, that means a lot of seventy-year-old tract houses, many still with much of their original plumbing and wiring.

Every project starts the same way, with careful measurements and an honest look at the systems. Then you see the design in 3D and get a written estimate that lists each item.

Request a Kitchen Remodeling Estimate

Share your South Whittier address, remodel goals, and timeline. A kitchen remodeling specialist will follow up with next steps.

What We Check

Utilities, Venting and a Protected Home

The practical groundwork for a South Whittier remodel.

  • Galvanized supply lines. with reduced flow and rust. We usually replace them from the kitchen to the main, or throughout.
  • Cast-iron drains. that may be cracked or heavily scaled. We camera them before deciding.
  • Undersized electrical service. , ungrounded outlets and too few kitchen circuits for a modern dishwasher, microwave, refrigerator and countertop appliances.
  • Subfloor damage. under the sink and dishwasher in raised-floor houses. Slab houses may have uneven patches where old flooring was removed.
  • Energy upgrades worth making. Both South Whittier ZIP codes, 90604 and 90605, are in Energy Commission climate zone 9, where summers are hot and dry. During a remodel, you have a rare chance to improve the kitchen's comfort. Efficient LED lighting is required by the energy code, and if you have or plan rooftop solar, an induction range is worth considering. It needs a 240-volt circuit, which we can add with the other electrical work.
Kitchen Permits

Permits for Your South Whittier Remodel

South Whittier is unincorporated. The City of Whittier, just to the north, has no say over permits here, and a Whittier or La Mirada mailing address doesn't change that. Building permits come from LA County Building & Safety, which has a South Whittier district office, and applications, plan check and inspection requests go through the County's EPIC-LA portal.

WorkUsually needsWhat to know
Painting and swapping hardwareGenerally exemptPurely cosmetic changes seldom require review.
Same layout, new finishesUsually a simple permitLA County Building & Safety confirms the exact category.
More outlets and new light fixturesElectrical permitCode requires dedicated appliance circuits.
Relocated plumbing or gasPlumbing permitInspected at rough-in.
Removing or opening a wallBuilding permit with plan reviewBearing walls need a beam and drawings.
  • Zoning questions go to County Regional Planning. We confirm the parcel is unincorporated before we start, because the boundary with the City of Whittier isn't always obvious from the street.
Service Details

Service Details for South Whittier Kitchens

Each section explains the job, the South Whittier angle and the typical cost.

Built around your storage

Cabinet Installation in South Whittier, CA

Most storage problems come from the cabinet plan, not the size of the room.

We measure every wall and opening, then plan drawers, pull-outs and tall storage before door styles. Hardware goes on last, aligned with a jig so every pull matches.

On South Whittier jobs

Ordering cabinets before the room is measured after demolition is one.

Sorted before demolition
  • Pick box material
  • Map storage zones
  • Solve the blind corner
  • Choose a finish that lasts
Crisp white Shaker kitchen cabinets

What should I budget for South Whittier cabinets?

Most South Whittier cabinet jobs land at

$300–$650 per linear foot of cabinet run.

Ceiling-height uppers and pantry units add to the total.

Surfaces for real cooking

Countertop Installation in South Whittier, CA

Most counter problems start with poor templating.

We bring samples so you can compare quartz, granite and porcelain side by side. The faucet holes are drilled to your fixture before install day.

Sorted before demolition
  • Pick the sink first
  • Approve the template
  • Check slab delivery route
  • Match the backsplash height
Quartz kitchen countertop installation

How much do granite tops cost in South Whittier?

South Whittier countertop installation typically comes to

$50–$120 per square foot, with installation.

Porcelain and premium quartz sit toward the high end.

Behind the range and sink

Backsplash Installation in South Whittier, CA

The backsplash is the last big finish, and the most visible.

Natural stone and handmade tile get extra care at the edges. Covers and plates are installed square to the pattern.

Sorted before demolition
  • Repair drywall first
  • Extend outlet boxes
  • Lay out outlet cuts
  • Dry-lay the pattern
Warm traditional kitchen

What is the cost of a kitchen backsplash here?

Installed tile generally runs

$14–$48 for each square foot of wall.

The tile you pick and the wall area set the total.

Built on a sound base

Kitchen Flooring in South Whittier, CA

New flooring is often where the old kitchen reveals its problems.

We remove old layers, check the subfloor or slab and level it. Grout is sealed where the tile needs it.

South Whittier detail

Finally, there's choosing a heavy stone slab without checking an aging raised floor underneath.

Sorted before demolition
  • Decide on under-cabinet runs
  • Check the subfloor
  • Confirm appliance clearance
  • Pick a wet-safe surface
Kitchen flooring with room transitions

What should I budget for South Whittier kitchen floors?

Kitchen tile flooring here runs about

$8–$11 per installed square foot.

Pattern and tile size change the labor.

Light where you work

Kitchen Lighting in South Whittier, CA

Dimmers and zones make one kitchen work for every hour.

We combine recessed lights, under-cabinet strips and pendants. The energy code requires high-efficacy fixtures and controls, which we design to.

What differs in South Whittier

Insulate the attic above it while the ceiling is open, replace single-pane windows with low-e units and install a ducted hood vented to the outside.

Sorted before demolition
  • Place switches where you reach
  • Set pendant height
  • Finish wiring before tile
  • Plan night lighting
Kitchen pendant and recessed lighting remodel

What does a lighting package cost here?

Most South Whittier lighting jobs land at

$940–$3,650 per kitchen in labor.

More zones and dimmers add a little.

Power, gas and air

Appliance Installation in South Whittier, CA

Choose appliances early; they drive the cabinet plan.

Openings are built to the spec sheets, not standard sizes. Old appliances can be hauled away.

The South Whittier angle

A third is a recirculating hood over a gas range.

Sorted before demolition
  • Pick panel-ready units
  • Size the hood
  • Plan the hood duct
  • Set anti-tip brackets
Kitchen appliance installation

What is the labor cost for South Whittier appliances?

Expect installation labor of

$520–$2,600 per kitchen, appliances extra.

Gas work, new circuits and hood ducting raise the labor.

Gathering space

Kitchen Island or Peninsula in South Whittier, CA

Not every kitchen has room for an island, and that is fine.

We check the floor structure for a heavy stone top. The island top is templated with the perimeter counters. We measure the room and check the framing before suggesting an island, so you don't fall in love with a design that won't fit. Where it doesn't, a peninsula with seating or a narrow work table often does the same job.

Local note

A 1950s South Whittier kitchen is typically a modest room, often with a dinette at one end. An island needs room: about 42 inches of clear walkway on each side, plus the island itself. In many of these houses, that only works if the dinette is absorbed or a wall comes out.

Sorted before demolition
  • Draw it in 3D
  • Finish the end panels
  • Check appliance doors
  • Pick storage side
Butcher block kitchen island prep surface

What does a South Whittier kitchen island run?

An island typically costs

$4,700–$19,000 for the finished island.

Seating overhangs need supports, which add a little.

Planned to the inch

Small Kitchen Remodeling in South Whittier, CA

In a small kitchen, every inch has to earn its place.

Everything is drawn to scale so doors clear each other. We plan a landing spot next to every appliance.

Worth knowing in South Whittier

A smaller share of South Whittier homes are condos, townhouses or apartments. In those, the HOA's rules on plumbing changes, flooring and work hours come first, and we get its approval in writing before ordering cabinets. Kitchens in these units usually keep their footprint, so the focus is on storage, surfaces and lighting.

Sorted before demolition
  • Build storage upward
  • Check aisle width
  • Draw door swings to scale
  • Confirm venting
Contemporary white kitchen

What does a compact kitchen cost in South Whittier?

Plan on

$23,000–$30,000 for the complete room.

Keeping the layout keeps it toward the low end.

Layout Planning

Layouts and Looks That Fit South Whittier

Owners we talk to usually want three things: more light, more counter space and a kitchen that connects to where the family spends time. In practice, that usually means removing or widening the wall between the kitchen and the dining or family room, adding a peninsula or island, replacing the window with a larger low-e unit and putting in recessed and under-cabinet lighting. If the wall carries ceiling joists, an engineer sizes a beam, and we show it on the County drawings.

  • Matching the rest of the house: Some South Whittier tract houses still have hardwood under the carpet in the living areas, along with plaster or textured walls and simple trim. When we open the kitchen to the living room, we pay attention to how the new space meets the old. That might mean weaving new boards into existing oak, matching the wall texture where a wall was removed, or picking trim that ties into the original. The aim is a kitchen that looks like it belongs to the house.
  • Mistakes we help owners avoid: A few problems come up often enough in 1950s kitchens to plan for. Old walls are rarely square, and a quarter inch matters. Another is keeping galvanized lines to save money, then opening the new kitchen's walls a few years later to replace them. We build these checks into the design stage so they don't become change orders.
  • How long it takes: County inspectors check rough plumbing, electrical and framing before the walls close, then do the final. If you're staying home, we set up a temporary kitchen and seal off the work area.
Cost Guide

Typical South Whittier Kitchen Prices

Budget $81,500–$153,500 for a full South Whittier remodel; lighter scopes cost far less.

What will a full kitchen cost in South Whittier?

For new everything plus a changed layout, $81,500–$153,500 is the realistic range. Your estimate is written from your measured room.

Gut-and-rebuild kitchen$81,500–$153,500All trades included

Typical price bands

From simple to complex:

Smaller kitchen or condo

Compact kitchens gutted and rebuilt.

$23,000–$30,000
Counters, backsplash, sink and lighting

New tops, tile and light without moving anything.

$24,000–$43,000
New cabinets and finishes, layout unchanged

Cabinets, counters and flooring replaced in the current plan.

$43,000–$81,500
Wall removed, island added, systems redone

A changed floor plan with all-new materials.

$81,500–$153,500
Premium or structural

Premium cabinets and appliances, or a beam.

$144,000–$240,000

Combined work is priced as one project. The overlap in labor and setup lowers the total.

In a 1950s house, the full-remodel band is typical once the wall comes out and pipes and wiring are replaced. If a previous owner already updated the systems, a same-layout remodel often lands in the mid band.

Process

How the Project Unfolds

Step 1

Look and listen

We measure, inspect and note what bothers you about the room.

Step 2

Layout

A scaled 3D drawing, revised until it works for you.

Step 3

Lock the scope

Itemized price agreed and permit drawings submitted.

Step 4

The build

Each trade in sequence, inspected before walls close.

Step 5

Handover

Punch list completed and the kitchen handed back to you.

Service Area

In South Whittier and Next Door

We cover all of South Whittier, from small kitchens to full rebuilds.

We also cover:

Project Gallery

Kitchen Ideas From Our Project Gallery

Reviews

What Homeowners Say About Our Kitchen Team

200+ reviews from homeowners across Los Angeles County.

★★★★★

"They measured carefully, showed a 3D layout, and did not push an island our aisle could not support. Cabinets and quartz look sharp, and the job site stayed clean."

Maria G., Los Angeles, CA
★★★★★

"Storage was the problem, tall pantry and drawer bases fixed it. Lighting under the cabinets made the counters actually usable at night."

Daniel & Rosa L., Los Angeles, CA
★★★★★

"Permits and inspections were handled without us chasing paperwork. One team for cabinets, counters, and appliances."

Hector P., Huntington Park, CA
★★★★★

"Peninsula instead of a forced island, exactly what our floor plan needed. Soft-close everywhere and a clear itemized quote."

Ana R., Cudahy, CA
★★★★★

"They coordinated the range hood vent correctly and explained electrical upgrades before work started. Professional from consult to walkthrough."

Luis M., Bell, CA
★★★★★

"Transparent pricing and a project manager who answered texts. The finished Shaker kitchen feels like our house, just updated."

Patricia S., Commerce, CA
FAQs

South Whittier Kitchen Remodeling FAQ

What is the price range for a South Whittier kitchen? +

Refreshes begin near $24,000; most new-cabinet remodels land at $43,000–$81,500, and layout changes run $81,500–$153,500.

Does the City of Whittier issue my permit? +

No. South Whittier is unincorporated, so LA County Building & Safety issues permits through EPIC-LA.

Should I replace galvanized pipes during the remodel? +

Usually yes. It's cheapest while the walls are open.

Can you match my existing hardwood floor? +

In many cases, yes, by weaving in new boards and refinishing.

What is the timeline for a South Whittier kitchen? +

A same-layout kitchen permit through EPIC-LA is usually issued in a few weeks. A beam or panel upgrade adds review. Most South Whittier kitchens take five to eight weeks on site.

How is payment structured? +

Payments follow project milestones in the written contract, not a large sum up front.

Book a South Whittier Kitchen Walkthrough

Start with a conversation about your South Whittier kitchen. Reach us at (213) 515-6576 or by form, and we reply within 24 hours, Mon–Sat 7AM–5PM.

  • Permit and inspections handled
  • Inspections scheduled for you
  • 3D layout before demolition

Request Your Consultation

Share your goals and timeline. A kitchen remodeling specialist will follow up.